Landscape structure and green space conflictsin connection with the establishment o f the Central Sewage Purification Plant on Csepel island

Authors

  • Imre Jámbor Corvinus University of Budapest, Faculty of Landscape Architecture

DOI:

https://doi.org/10.36249/4d.4.6109

Keywords:

-

Abstract

According to the latest decisions, the new Central Sewage Purification Plánt (CSPP) of Budapest vvill be established on a 29 hectare area alongside the N-W waterfront of Csepel island. The implementation ofthe project means that the city park - formerly planned on a 100-hectare area of the Csepel island - cannot be realised any more; it could be built only on a 25 hectare large and disadvantageously devided area.

Author Biography

  • Imre Jámbor, Corvinus University of Budapest, Faculty of Landscape Architecture

    professor
    head of department

    e-mail: imre.jambor@uni-corvinus.hu

Published

2006-11-01

Issue

Section

Notices

How to Cite

Landscape structure and green space conflictsin connection with the establishment o f the Central Sewage Purification Plant on Csepel island. (2006). 4D Journal of Landscape Architecture and Garden Art, 4, 47-59. https://doi.org/10.36249/4d.4.6109